Windsor Floor Polisher U20X-10090610 Operations Instructions Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
HANDLE INSTALLATION
86301190 FLOOR POLISHER 01/04/08
3-2
The machine is shipped with handle unassembled.
Follow these steps for installation:
1. Remove handle (86218450-PRV NO. 38291) and deck assembly from carton.
2. Attach handle assembly to base using hardware kit (86219680-PRV NO. 47331) (attached to handle in a
plastic bag) items 1, 2, and 3.
NOTE: The spacers (items 1) are required for the correct operation of the handle. The spacers are positioned
completely inside the pivot holes in the casting, and are held in place by tightening the bolts and washers
(items 2 and 3) against the spacer.
3. Remove bolt, nut and washers (items 4, 5 and 6) from lower block on handle assembly. Attach links as
shown. Tighten bolt and nut securely, then back off 1/4 to 1/2 turn.
4. Check handle for movement up and down.
5. Plug motor cord into handle cord receptacle.
This must be installed by qualified personnel. Read all
instructions thoroughly. The machine is shipped with
handle unassembled.
2
SEE NOTE
1
ASSEMBLY
DECK
5
6
4
HANDLE
RECEPTACLE
WHEN INSTALLING THE HANDLE
ASSEMBLY, CHECK ORIENTATION OF
THE CORD ASM AND CORD HOOK.
MOTOR
PLUG
HOLE
3
PIVOT
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 25 26

Comments to this Manuals

No comments